2024.02. 24
Number of this text: 1286, read about 2 minutes long.
Introduction : The new generation of manned spacecraft is named "Mengzhou", and the moon lander is named "Lan Moon".
Source | CCTV News
According to the China Manned Aerospace Engineering Office, after public collection and selection, recentlyThe name of the Chinese manned moon detection task has been determined. The new generation of manned spacecraft is named "Mengzhou", and the moon lander is named "Lan Moon".
After the construction of the Chinese space station is completed, the landing of the moon becomes the next goal for the Chinese to explore space.With the full launch of the mission of the Mens Monthly Detection Project, the naming of the new aircraft naming for manned lunar exploration is also on the agenda.
In August 2023, the China Manned Aerospace Engineering Office carried out the name of the new aircraft name of the manned lunar exploration task for the public.Receives nearly 2,000 contributions from organizations from the fields of aerospace, technology, and cultural communication and people from all walks of life. After the review and review by experts, the new generation of manned spacecraft was named "Mengzhou", and the moon lander was named "Lan Moon".
The name of the new aircraft has distinctive Chinese characteristics, the characteristics of the times, and cultural characteristics."Mengzhou" imply the human space dream that carries the Chinese peoples aerospace dream and starts the new journey of exploring space, which also reflects the inheritance of the system with the Shenzhou and Tianzhou spacecraft family.There are two models of the near -ground version of the task. Among them, the moon landing version uses the "Mengzhou Y" (the first letter of the spacecraft name+the "Month" byte syllable)."Lan Moon" is taken from Chairman Maos poem "Can go to the moon for nine days", showing the heroic and self -confidence of the Chinese who explore the universe and land on the moon.Earlier, a new generation of manned carrier rocket has been named "Long March 10".
At present, the Mengzhou spacecraft, Lanyue lander and Long March 10 carrier rocket have fully entered the initial development stage, and various tasks have progressed smoothly.
China Manned Monthly Monthly Surveying Mission is promoting in an orderly manner
my country will realize the manned landing on the moon by 2030 to carry out scientific exploration . At present, the Mengzhou spacecraft, the monthly lander and the Long March 10 carrier rocket have entered the initial development stage. Progressing well.
According to the preliminary preliminary plan published by the manned manned landing of the China Manned Aerospace Engineering Office, , Two Long March 10 Launar Rockets will be sent to the monthly landing device and Mengzhou spacecraft to the ground monthly transfer track.
Director of China Manned Aerospace Engineering Office Assistant Ji Qiming: Two aircraft are in the MoonThe orbit meets the docking, the astronauts enter the lander and send the astronauts to the moon by the lander. The astronauts conduct scientific inspections and sample collection on the moon according to the plan.After completing the established task, the astronauts rose to the ring of the moon to the ring -moon orbit. The two aircrafts met each other again. The astronauts transferred the moon samples to the spacecraft, and the spacecraft transferred the track from the moon to the earth.
Ji Qiming introduced that the implementation of the manned lunar detection project is developed, first and positive development, unmanned flight test, manned moonlight in accordance with the planThe flight task is on the way step by step.my country has completed key technical research and plan development at the end of 2023. At present, various development and construction work is stepping up.
Ji Qiming, Director of China Manned Aerospace Engineering Office: The major aircraft such as the human spacecraft, the moon lander, and the moon landing suit have completed the development of the plan stage, and entered the initial development stage. The development, production and ground experiments of first -sized products are being launched in an orderly manner.The overall technical solutions have been completed by the aerospace officers measurement and control communication, launching field, and landing field.Scientific research and application systems and moon -faced activities support systems are stepping up the development of scientific loads and manned lunar cars in the moon surface.The newly -built testing facilities and equipment of the Wenchang launch site will also be fully launched.Overall see the mission of the moons moon detection project, and the development and construction work is progressing smoothly.
WeChat Editor | Su Xiao