Quick Technology November 11 news, according to media reports, in the face of fierce competition between AMD and NVIDIA, planned to expand cooperation with TSMC in 2025 through 2025Improve its chip competitiveness.
According to revealed, Intels Lunar Lake and Arrow Lake chipsets will increase the OEM orders of TSMC 3 nanometer, especially the Arrow Lake chip.
Arrow Lake is regarded as the key to maintaining a leading position in the AI PC market. It aims to reduce the power consumption at least 100 watts while maintaining high performance and high clock frequency.
Intels financial report released at the end of October shows that its third quarter revenue declines by 6%and the loss has reached a record 16.6 billion US dollars, but Intel did not give up the wafer foundry businessEssence
In September, Intel announced that the 18A process was progressing smoothly and exceeding expectations. The original 20A process set by Arrow Lake high -performance processor has been canceled and changed to external foundry manufacturing.
The supply chain news pointed out that from the perspective of the 13 and 14 generations, the core configuration of 8P+16E is adopted, and the core area of the operation accounts for 70 % of the overall chip area, and TSMC 3mm nanometer is used.After the process, the same core configuration accounts for only one -third of the overall area, and the NPU unit is added.